Period2012 – 2014
CapacityExpansion from 50 MTPA to 80 MTPA (Phase 1); Basic design 80–110 MTPA (Phase 2)
Voltage66 kV Switchyard, 11 kV, 415 V
RoleLead Electrical / Senior Design Engineer
- Bankable Feasibility Study (BFS) and FEED for port power distribution system
- Electrical design basis, design criteria and power reticulation system
- Master SLD and protection SLD preparation
- Load flow, short circuit and harmonic analysis (ETAP)
- 66/11 kV substation design — switchyard, earthing, lighting, cable tray layouts
- Technical specifications and datasheets — 66 kV switchyard, prefabricated switchroom, HV/LV motors, HV VFDs
- Cable schedule, sizing and I/O listing for HV and LV systems
- Earthing and lightning protection philosophy
- Power drive system (PDS) design for conveyor system
- MTO and tender documentation for EPC procurement
- Vendor drawing review and approval
Period2011 – 2012
Capacity3,200 TPH rated, Five conveyors, Wagon loading silo
Voltage33 kV / 6.6 kV
RoleLead Electrical / Senior Design Engineer
- Electrical design basis, design criteria and power reticulation system
- Maximum demand calculation and transformer sizing
- Master SLD and protection SLD
- Cable schedule with HV/LV sizing and I/O listing
- Tender specifications — 33 kV & 6.6 kV cables, switchboards, power transformers, distribution transformers, LV switchboards, high mast and building lighting
- 33/6.6 kV substation design with earthing, lighting and cable tray layouts
- Bill of Quantity for Electrical & Instrumentation
- EPC tender document preparation
- Vendor drawing review and approval
Period2010 – 2011
Capacity6,000 TPH rated, Two berths, Five conveyors, Wagon loading silo
Voltage11 kV / 6.6 kV
RoleDesign Engineer
- Electrical design basis and power reticulation system
- Maximum demand calculation and transformer sizing
- Master SLD and protection SLD
- Cable schedule with HV/LV sizing and I/O listing
- Tender specifications — 11 kV cables, 11 kV & 6.6 kV switchboards, power transformers, converter duty transformers, LV switchboards, high mast lighting
- 33/6.6 kV substation with earthing, lighting and cable tray layouts
- Bill of Quantity and EPC tender documents
- Vendor drawing review and approval
Period2016 – 2018
FeaturesShip-to-shore cranes, backup yard, container handling equipment
RoleProject Engineer (Electrical & Instrumentation)
- Feasibility study and concept engineering for electrical infrastructure
- Construction power planning and initial site development
- Discussion and approval process with statutory authorities (KSEB / NHAI)
Period2012 – 2013
FeaturesG+2 port operations office buildings, 2,000 sq.m floor area
RoleDesign Engineer
- Power distribution system design for incoming power and building power
- Preparation of terms of reference and appointment of detail design consultant
- Review of tender documents and construction drawings
- Installation assistance and site visits during execution
Period2011 – 2012
ScopePower supply facility and high mast lighting for T9–T13 berths
RoleDesign Engineer
- Construction drawings for 11 kV cable laying
- Vendor drawing review for 11 kV breaker panels
- High mast lighting design and location finalisation